Barbie for big girls.

Posts tagged “Daytime Impact Dasha”

2016 Fashion Royalty Collection–A Delicate Bloom

©2016 Integrity Toys, Inc.

Better late than never right?!  Some collectors were beginning to wonder if we were going to get a new release or not.  Granted, the reveal is a bit later than we have had in years past.  One thing I was not remembering, however, was the fact that the WClub 2016 did not start until February of this year.  Some have pointed out that this reveal halfway into the “club” year is about right.  Time and collector sales numbers will finish the thoughts and stories on that one.  In my opinion, revealing this collection 6 months into the club year is a bit late.  That fact does not stop me from appreciating the product nor making purchases so there you go.  If I am not totally satisfied with the delay in the reveal, I am satisfied with the delivery time on these babies.  They are all available within the next couple of months so no long wait times.  On the downside…They are all coming DUE FOR PAYMENT in the next couple of months.  This is not good for the wallet. 

Note:  “Eye Decals”  I have marked which of these dolls are using the new eye decal application method under doll tech specs for those who are interested.  For me, this new method is ok for now.  Some collectors are very averse to this technique being used and I wanted to make sure everyone had the information before they purchase.  For me, I am willing to give this technique a chance.  I also respect people’s consumer choice and for many this is important information to have before they purchase.

For those readers who are not WClub members, you can find most of these dolls on Integrity Toys dealers sites.  Be aware, WClub members had this information days ago so if you want any of these, contact dealers ASAP.  Some may already be sold out.

Important note from Integrity Toys:  The dolls pictured in this release are prototypes. Final fabrics, colors and textures may vary slightly.  Images of dolls used in this post are property of Integrity Toys, Inc. and under their copyright. 

Contrasting Proposition
Natalia Fatalè™ Dressed Doll
The Fashion Royalty® Collection
Approximate Ship Date: September 2016
Limited Edition Size: 700
Suggested Retail Price: $135.00
 
Doll Tech Specs:
 
Body Type: FR2013
Head Sculpt: Natalia Fatalè™ 2.0
Quick Switch Feature: No
Skin Tone: FR White
Hair Color: Blond
Eyelashes: Yes, Hand-Applied

©2016 Integrity Toys, Inc.

©2016 Integrity Toys, Inc.

©2016 Integrity Toys, Inc.

©2016 Integrity Toys, Inc.

Love the lace overlay and added beading to the lace!  I am also really loving the chunky jewelry design.    All in all a very elegant look.  For some reason, this Natalia left me without a clear “ must have” which is weird.  I totally go for the elegant and refined and this dress has it.  The doll just left me “meh” though and not sure if it was the simplistic hairstyle ( more on that later) or the pale skin tone on a character that I prefer as sultry Latino.  Love the jewelry though so may have to find that in the secondary market.  As I write this I also realize that some of my lack of excitement over this one may be the use of black.  I feel like IT overdosed on it’s use of black last year and here it is again…albeit as secondary colors but still…it’s black!

Emerging Rebel
Kyori Sato™ Dressed Doll
The Fashion Royalty® Collection
Approximate Ship Date: Week of August 22nd, 2016
Limited Edition Size: 700
Suggested Retail Price: $135.00
 
Doll Tech Specs:
 
Body Type: FR2013
Head Sculpt: Kyori Sato™ 2.0
Quick Switch Feature: No
Skin Tone: Japan
Hair Color: Medium Brown
Eyelashes: Yes, Hand-Applied

**Note: Decal Eyes**

©2016 Integrity Toys, Inc.

 

©2016 Integrity Toys, Inc.

©2016 Integrity Toys, Inc.

©2016 Integrity Toys, Inc.

YAASSSSSSSS!  Now we are talkin’.  I saw this caramel tressed Kyori and felt the wallet open ( a chorus of angels may have struck a chord as well).  I love the soft pastel color pallet!!  Not a whiff of black here.  I love the embroidered leather ( ok not real leather but still) and the edgy refinement of it.  It feels forward and still elegant.  This feels like Jason influence to me and I like it.  Also, whoever is heading up the jewelry and accessory department at IT…HATS OFF!!  Here we have another new design in earrings and its fabulous!  Love the grey purse and sunglasses.  The lavender shoes are EVERYTHING!  Me likes.  I am hoping Dania’s grey gloved hands of last year’s club doll will match this one.

Daytime Impact
Dasha™ Dressed Doll
The Fashion Royalty® Collection
Approximate Ship Date: September 2016
Limited Edition Size: 700
Suggested Retail Price: $135.00
 
Doll Tech Specs:
 
Body Type: FR2013
Head Sculpt: Dasha™
Quick Switch Feature: No
Skin Tone: FR White
Hair Color: Platinum
Eyelashes: Yes, Hand-Applied

**Note: Decal Eyes**

©2016 Integrity Toys, Inc.

©2016 Integrity Toys, Inc.

©2016 Integrity Toys, Inc.

©2016 Integrity Toys, Inc.

Ok…so I have to admit my first thought on this one came straight from the “I’m a Mom of a 16 year old girl” and it said “ That skirt does not satisfy the fingertip rule”.  Then I started paying attention to the details and felt better.  First I looked at the doll.  Gorgeous Dasha with beautiful smoky eyes pale blond hair.  Stunning.  The jacket is really quite detailed so I told the “mom” in me to sit down and reflect.  I think this one will be amazing redressed and I have plans for that jacket ( maybe not with the skirt Winking smile)

Fresh and Delightful
Véronique Perrin® Dressed Close-Up Doll
The Fashion Royalty® Collection
Approximate Ship Date: Mid to Late October 2016
Limited Edition Size: 700
Suggested Retail Price: $89.00 + Shipping and Handling
 
IMPORTANT!
THIS DOLL WILL BE OFFERED DIRECTLY FROM IT DIRECT VIA A RIGHT-TO-BUY LOTTERY. MORE DETAILS WILL BE SENT IN MID TO LATE OCTOBER.
NOTE: THIS DOLL WILL NOT BE OFFERED VIA DEALERS.

Doll Tech Specs:
 
Body Type: FR2013
Head Sculpt: Veronique 2.0
Quick Switch Feature: No
Skin Tone: Hungarian
Hair Color: Black
Eyelashes: Yes, Hand-Applied

**Note:  Decal eyes**

©2016 Integrity Toys, Inc.

©2016 Integrity Toys, Inc.

©2016 Integrity Toys, Inc.

This one will be through IT Direct not dealers people.  What did I notice about this doll first?  The price!!  Alain explained that this was done as tribute to the “basic doll” that IT has done in years past.  I don’t know that there is anything really “basic” about this beauty.  The price alone certainly has many interested.  One pet peeve however…and this is the photographer in me but…the right eye on this lady is off ( left eye pupil is forward looking, right eye it is off to side).  I am expectant and hopeful that in production this item is fixed. WClubbers, look for emails on how to acquire this one sometime in October.

Fabulous Fields
Luchia Z.™ Dressed Doll
The Fashion Royalty® Collection
Approximate Ship Date: September 2016
Limited Edition Size: 600
Suggested Retail Price: $135.00
 
Doll Tech Specs:
 
Body Type: FR2013
Head Sculpt: Luchia Z.™ 2.0
Quick Switch Feature: No
Skin Tone: Cream
Hair Color: Red
Eyelashes: Yes, Hand-Applied

**Note: Decal Eyes**

©2016 Integrity Toys, Inc.

©2016 Integrity Toys, Inc.

©2016 Integrity Toys, Inc.

A redheaded Luchia?!!!  I’m in!!  And she has cream skin tone.  Me likes!  The dress is very interesting.  Feeling a little Valentino here but I have not researched so have no idea how close I am on that one.  The yellow purse is certainly a pop of color in this one but I may switch that out.  Also, while I love the industrial jewelry in this collection, I would go for something softer with this gown.  Grey pearls maybe?  Don’t know but will have fun trying things out.

Ruffles and Blooms
Eugenia Perrin-Frost™ Dressed Doll
The Fashion Royalty® Collection
Approximate Ship Date: September 2016
Limited Edition Size: 800
Suggested Retail Price: $150.00
 
Doll Tech Specs:
 
Body Type: FR2013
Head Sculpt: Eugenia Perrin-Frost™
Quick Switch Feature: No
Skin Tone: Hungarian
Hair Color: Auburn
Eyelashes: Yes, Hand-Applied

©2016 Integrity Toys, Inc.

©2016 Integrity Toys, Inc.

©2016 Integrity Toys, Inc.

Yes, yes…this gown is almost in retinal searage territory.  My first question was…”Is it yellow or green yellow?”  I am thinking it is more in the yellow category but photographs can be deceiving.  Either way, I find myself admiring this one which surprises me because I am NOT a yellow fan.  I ADORE the embroidery on this one and the fact that it is an homage to the house of Oscar de la Renta endears this one to me.  I am also loving the auburn haired Eugenia with the pink/coral  lips.

ODLR Spring 2016 RTW

Photo: Yannis Vlamos / Indigitalimages.comPhoto: Yannis Vlamos / Indigitalimages.comPhoto: Yannis Vlamos / Indigitalimages.com

Key Pieces
Elyse Jolie™ Dressed Doll Gift Set
The Fashion Royalty® Collection
Approximate Ship Date: Mid to Late October 2016
Limited Edition Size: 800
Suggested Retail Price: $199.00
 
Doll Tech Specs:
 
Body Type: FR2013
Head Sculpt: Elyse Jolie™
Quick Switch Feature: No
Skin Tone: Japan
Hair Color:  Golden Blond/ Champagne
Eyelashes: Yes, Hand-Applied

©2016 Integrity Toys, Inc.

©Marcio Madeira

Armani Privé Spring 2010 Couture

©2016 Integrity Toys, Inc.

©2016 Integrity Toys, Inc.

Courtesy of Oscar de la Renta

Oscar de la Renta Resort 2016

©2016 Integrity Toys, Inc.

©2016 Integrity Toys, Inc.

First of all…giftset with Elyse…no brainer for me. 1) Love, love, love the soft palette on this facial screening. I believe Jessy Ayala is in charge of all facial screenings now so..Jessy..LOVE!  2) How adorable is this lingerie set?!!…the bows…the bows..you had me at the bows 3) A Marchesa inspired gown!! 4) Another nod to the house of Oscar de la Renta.  Sign me up, I’m in.  I am not a huge fan of the high/low skirt with a suit but it’s not a deal breaker for me.  If they had just had a pencil skirt in the same fabric as the jacket, this set would have been close to perfect for me.  This was the first one in my shopping cart people…the very first.

But wait…there is more!  There is always more with Integrity Toys.  More, as in…event doll!

©2016 Integrity Toys, Inc.

Love, Life and Lace
Agnes Von Weiss™ Dressed Doll
The Fashion Royalty® Collection
2016 Online Event Doll
Limited Edition Size: TBA
Estimated Ship Date: Q4 / Winter 2016
Special W Club Price: $140.00 + Shipping, Handling and Applicable Sales Tax*.

Doll Tech Specs:

Head Sculpt: Agnes Von Weiss™
Body Type: FR2013
Quick Switch Feature: No
Skin Tone: Cream
Hair Color: Light Brown
Eyelashes: Yes, Hand Applied

**Need to be WClub member to purchase this one**

©2016 Integrity Toys, Inc.

©2016 Integrity Toys, Inc.

©2016 Integrity Toys, Inc.

©2016 Integrity Toys, Inc.

THUD!  Holy Cow collectors!  I don’t think my fingers hesitated one single moment before hitting the “BUY” button on this one..and from what I am seeing from other WClubbers…they feel the same way.  This one may be up there as one of the largest edition sizes in the history of the WClub.  Edition size will be driven by WClub members who order and I know many are ordering multiples of this one. ( one per membership and many members have multiple memberships).  Where do I start?!  The dress…oh my word the dress!  Pale peachy pink with beaded lace overlay.  Ahhhhhh!!! –another chorus of angels is singing here.  That adorable pink bow clutch!  I am even liking the industrial necklace with this gown.  I and many other WClubbers will be looking forward to the Winter ‘16’ delivery of this one.  Please oh please let it be before Christmas!!! ( not likely but a girl can dream).

One final note that needs to be made about this collection is the very paleness of it.  While I love that they gave us colors other than black in this collection ( yes, they really do listen to their collectors), they did not have any skin tone diversity in this collection.  The yellow gown alone would have been stunning on an Adele.  It left many collectors asking “where is the diversity?”  A very valid question and one I hope Integrity addresses. 

More Reveals..ITBE 16 inch and MLP ❤ coming up…….